top of page

ASSET MULTIPLATE PIPE ARCH | SCHOOL ROAD




asset MultiPlate MP200 Pipe Arch (length 37.5m) was used on this project. The works comprised of the installation of a corrugated steel segmental culvert below School Road required to carry a conveyor for extracted material from an extension to East Bilney Quarry.

Comments


bottom of page