ASSET MULTIPLATE ARCH | BHLARAIDH WIND FARM

GLENMORISTON ESTATE - SCOTLAND



PROJECT OVERVIEW

Our client's designers proposed using an asset MultiPlate arch for a water crossing, which forms part of the main access route to Bhlaraidh Wind Farm (located on the Glenmoriston Estate, Scotland). asset International Structures Ltd were responsible for the design and supply of the steel arch, and made our proposal to the framework contractor.

 

The chosen solution was an asset MutliPlate MP200 corrugated arch (approx 9m span) which has a 50-year design life.


3D model of a concrete bridge over water

PROBLEM SOLVED

The corrugated steel structure allowed for further construction traffic to facilitate the building of a new substation, which enabled construction to continue without disruption or delay. Utilising over 65 years' experience in offering flexible steel designs in a variety of applications, the asset MultiPlate arch acts as the main route access to the site.


ESG

The lightweight structure didn't require heavy lifting on site, improving health and safety. The open-bottomed arch helped to retain the natural watercourse and protected the stream bed. The lack of an enclosed structure meant that work was carried out to SEPA (Scottish Environmental Protection Agency) guidelines.